806 Topic(s)
You configure the SQL server memory to ensure that the reports do not take more time to get generated.
You connect AD to a SmartX AS-P server or SmartX AS-B server in order to communicate with EcoStruxure BMS servers over a USB connection, to supply the AD with power, and to ensure that its battery is charged.
You connect AD to a USB power adapter in order to supply AD with power and to ensure that its battery is charged.
You connect AD to an Automation Server in order to communicate with EcoStruxure BMS servers over the USB connection. You connect AD to a USB power adapter in order to supply AD with power and to ensure that its battery is charged. You use a USB “Y” cable to connect AD to both an Automation Server and a USB power adapter.
You restart the Twisted Pair Adapter to intialize the device.
You wire the screw terminals on a Twisted Pair Adapter to connect the adapter to a twisted pair cable network. Always use the recommended wires (or wires with larger cross-sectional area).
You wire the screw terminals on a Twisted Pair Adapter to connect the adapter to an external 24 VAC or 24 VDC power supply. Always use the recommended wires (or wires with larger cross-sectional area).
You install a Twisted Pair Adapter on a flat surface inside a cabinet to properly fasten the device and to allow for sufficient ventilation.
You install a Twisted Pair Adapter on a DIN rail inside a cabinet to properly fasten the device and to allow for sufficient ventilation.
You connect Twisted Pair Adapter to an automation server or a BACnet/IP controller to enable Ethernet communication over a twisted pair network. Always use the recommended cables.