984 Topic(s)
You install an RP controller expansion multi-sensor on a ceiling using the supplied mounting ring to properly fasten the multi-sensor on the ceiling.
You install an RP controller expansion multi-sensor on an octagon junction box using the supplied mounting ring to properly fasten the multi-sensor to the junction box.
You install an RP controller expansion multi-sensor into a dropped ceiling using the mounting springs to properly fasten the multi-sensor to a ceiling tile.
You style the appearance of an event in the Events pane or Event View to easily detect the event when it occurs.
You override a pair of tristate pulsed output points to manually control the duty cycle of the outputs.
You override a pair of tristate output points to manually control the value of the outputs.
You override a digital pulsed output to manually control the duty cycle of the output.
You override an analog output to manually control the analog value of the output.
You override a digital output to manually control the digital value of the output.
You restore the EcoStruxure BMS server to revert back to a previous snapshot of the EcoStruxure BMS server data.