1147 Topic(s)
You use the default System folder for a number of engineering operations in your EcoStruxure BMS.
Part number: SXWTBASW110A02
You engineer your system using the engineering tools.
Use the Type permissions view to grant user accounts or user account groups extended access to a specific type.
The Schneider Electric hardware devices for the EcoStruxure BMS include terminal bases, PS-24V power supplies, SmartX servers such as SmartX AS-P servers and SmartX AS-B servers, MP Series controllers such as MP-Cs and MP-Vs, I/O modules, and ADs.
You print an I/O wiring list for the I/O bus that describes which I/O points are associated with each I/O module. You use the printed copy of this list to help wire the I/O bus network.
You export a PCT project to your hard drive to keep a copy of the project at your hard drive.
The EcoStruxure Building Operation software gives you a number of functions to monitor and manage your facilities.
You duplicate an EcoStruxure BMS server from a backup set using Restore when you want to reuse configuration data from a backup set in a standalone SmartX server.
The Status LED on the front of the SmartX devices changes color and flashes to indicate the status of the device.