1384 Topic(s)
This section provides grounding and power recommendations for system configurations with Central IO modules and PS-24V units.
This section provides recommendations on minimum wire sizes (cross-sectional areas) and maximum wire lengths for the wires connected to the screw terminals of Central IO modules, AS-B servers, RP and MP controllers, and IP-IO modules. Recommendations on minimum wire size and maximum cable length for the digital inputs of the RP controller expansion modules, the DALI bus of the DALI light modules, the SMI Interface of the SMI blind modules, the Zigbee DALI and 0-10V modules, and the KNX Modbus gateway are also provided. The recommendations are for guidance only. Other wire sizes and lengths may be used, depending on wiring rules and when appropriate.
You must convert any CRT or CER files to PEM. BMS only supports PEM format.
The License Settings dialog box is used to view the license settings when troubleshooting. Do not change the settings in this dialog. Changes in this dialog results in license violation. The dialog looks different depending on if it is opened from the Other menu in the Show Licenses view toolbar, or if it is opened from the Entitlements View.
In the EcoStruxure BMS servers, variable values are primarily stored in flash memory in order to have their values survive power fail and server shutdown. However, values that are often collected are only stored in the SDRAM memory. This is done to protect the flash memory in the automation server.
You remove demo licenses from automation server using Device Administrator.
Use this workflow to return demo licenses from automation servers.
Use the Add Entitlement from file dialog box to add the entitlement.
Use the Add Entitlement from ID dialog box to add the entitlement ID when the entitlement certificate HTML-file is not available.
You return licenses so that they can be used elsewhere.