earth_america
user_standard Log on
action_search_stroke
earth_america

Enterprise Central

Refine your search
arrow2_down
Refine your search
Ok
Ok
Ok

916 Topic(s)

User Interface

Use the Import project dialog box to choose the name of the project you are importing, and to decide if the project is a new one or a replacement for an existing one.

How to

You import trend log data to move trend log data between systems.

How to

You configure an alarm to make a sound when it is triggered so that the operator can hear the alarm.

How to

You configure the built-in Alarm pane to automatically open an Alarm View dialog box in a new window when an alarm is triggered.

Concept

​Values in the EcoStruxure Building Operation software are stored in the EcoStruxure Building Operation database with all input decimals. If a stored value consists of more decimals than the operating system is defined to display, the value is rounded off according to the operating system settings before it is displayed in WorkStation.

Concept

When you configure a schedule that controls events in a single part of a building, you might also want the same events to occur in other areas of the building. You can establish a lead and shadow relationship to synchronize the events in schedules and dates in calendars.

How to

You configure a schedule as a shadow to synchronize it with a schedule that already contains all weekly events and exception events.

How to

You configure a calendar as a shadow to synchronize it with a calendar that already contains all exception dates, date ranges, or calculated dates, such as a holiday calendar.

Concept

You can customize how date and time are presented in a notification text or a notification report text.

How to

You stop the Reporting Agent Windows service to stop collecting report data.