earth_america
user_standard Log on
action_search_stroke
earth_america

Mobile Apps

Commission
HMI Kiosk
SmartXKiosk
Refine your search
arrow2_down
Refine your search
Ok
Ok
Ok

78 Topic(s)

Concept

Advanced Display v3 (AD v3) is the successor to AD v2. AD v3 provides an industrial grade Human Machine Interface (HMI), with battery-free power supply, for local access to the EcoStruxure BMS servers.

Specifications

Hardware Installation

Part number: SXWADWIFI10002

How to

Running the Commission mobile application on a Windows laptop computer, you can connect directly to an Ethernet port on a networked BACnet/IP controller, or use an Ethernet switch to connect to a group of controllers.

How to

You connect to the network and acquire an IP address so that you can communicate with the devices on that network. Most network connections used with the Commission mobile application assign an IP address to your mobile device using DHCP, which is a type of automatic addressing. However, certain Ethernet or WiFi networks may require you to use a static IP address. Consult with the network administrator to determine if a static IP address is required.

How to

You log on to the Commission mobile application to perform commissioning, flow balance, and checkout operations on BACnet/IP controllers.

How to

You connect to a device to begin all commissioning tasks.

Specifications

How to

Before you can do an I/O checkout on a DALI light, you must first perform a DALI discovery and associate the discovered physical lights with logical lights in the RP controller configuration. You then wink DALI lights in order to identify the light location when associating the physical light with the logical light output.

Concept

The Commission mobile application is a powerful and convenient tool for use with BACnet/IP Controller devices. However, as with any application, security considerations and appropriate actions must be taken to guard against unauthorized access.