137 Topic(s)
The dates specified in a calendar are shown in the date list. You can specify dates in a calendar by three different methods:
The Basic view of the Schedule Editor serves as a workspace to plan and design a schedule. You use this editor to create, manage, and display weekly scheduled events and exception events.
A weekly event occurs every week for an extended period of time on a regular basis. You can schedule more than one weekly event for each day of the week.
When you create a schedule, the time zone of the EcoStruxure BMS server that contains the schedule determines the execution of the events. If the schedule is copied to an EcoStruxure BMS server in a different time zone, the specified dates and times relate to the new time zone.
You store expired events to keep an expired calendar event for future reference.
Use the Snap To menu to edit the grid time interval for the shedule view to define how precis you can be when editing the time span of a schedule event using the drag and drop method in the Advanced Schedule Editor. The default time interval is 15 minutes.
Use Show client time zone to toggle between displaying the client time zone in addition to the EcoStruxure BMS server time zone in the Advanced Schedule Editor.
Use the Search Results List context menu to perform a number of operations on the selected object or objects.
A schedule is a sequence of events that determines when essential events occur in a building automation system: doors locking or unlocking, temperature raised or lowered, or equipment turned on or off.