1460 Topic(s)
You reset a meter object, for example, after a testing. After the reset the meter object restart calculations and logging.
Meter objects can be reset. This is typically done after you have tested a meter object configuration or when you want to restart the calculation and logging in a meter object.
A number of software and features need licenses.
There are a number of different clients, servers, and features that requires licenses to operate.
These hardening guidelines applies to the EcoStruxure Building Operation software products and the EcoStruxure BMS server products.
If the automation server firmware is damaged, the automation server can be put in DFU (Device Firmware Upgrade) mode to be able to communicate on the USB device port.
There are four different types of reset for the automation servers: warm start, cold start, reset, and reset to DFU mode. Depending on the type of reset, the automation server can be reset using the reset button or a command from WorkStation.
The I/O bus consists of the following parts:
The Status LED on the front of the automation devices changes color and flashes to indicate the status of the device.
It is important to perform the grounding correctly for the following reasons: