earth_america
user_standard Connexion
action_search_stroke
earth_america
Log on to rate and give feedback 1 2 3 4 5 Log on to rate
0
Interface utilisateur

Interface utilisateur


Produits : AS-B, Enterprise Server, AS-P, Project Configuration Tool
Fonctionnalités : Alarmes
Version produit : 3.2, 3.3, 2022
15/10/2020

Add Checklist Step Dialog Box

Use the Add Checklist Step dialog box to add a new step to a checklist.

 
action_zoom_plus_stroke Add Checklist Step dialog box
Figure : Add Checklist Step dialog box

Table : Add Checklist Step

Component

Description

Name

Type the name of the checklist step.

  • Add Checklist Step Dialog Box
  • Control Panel Tab
  • Checklists
  • Add Checklist Step Dialog Box
  • User Actions