This section provides recommendations on minimum wire sizes (cross-sectional areas) and maximum wire lengths for the wires connected to the screw terminals of Central IO modules, AS-B servers, RP and MP controllers, and IP-IO modules. Recommendations on minimum wire size and maximum cable length for the digital inputs of the RP controller expansion modules, the DALI bus of the DALI light modules, the SMI Interface of the SMI blind modules, the Zigbee DALI and 0-10V modules, and the KNX Modbus gateway are also provided. The recommendations are for guidance only. Other wire sizes and lengths may be used, depending on wiring rules and when appropriate.
Use the Device Restart function to perform a device restart of the BACnet/IP controller.
You log on to the Commission mobile application to perform commissioning, flow balance, and checkout operations on BACnet/IP controllers.
When connecting to a network at the job site, the Commission mobile application device must have either a dynamic or static IP address.
When the Relay 10 module is configured on the RP-C, you can log into the Commission mobile application and configure the following inputs and outputs:
You test the relay module relay outputs to ensure they are operating correctly
You perform I/O checkout to verify that the wiring between the devices was done correctly and to verify that the physical inputs and outputs are working properly.
You connect to a device to begin all commissioning tasks.
You perform an I/O checkout to verify that installed modules match the RP controller configuration and are communicating properly. You configure RP controller expansion modules in WorkStation.
Use the Diagnostic Files function to view and export diagnostic files from a BACnet/IP controller.